| Item |
Offence |
Section |
Set Fine |
| 1. |
Contractor‑‑fail to notify of change of information |
3(3) |
$100.00 |
| 2. |
Contractor‑‑fail to register as itinerant seller |
4(1)1 |
$100.00 |
| 3. |
Contractor‑‑fail to maintain required insurance |
4(1)2 |
$200.00 |
| 4. |
Contractor‑‑work without proper supervision |
4(1)3 |
$200.00 |
| 5. |
Contractor‑‑cause work to be done without proper supervision |
4(1)3 |
$250.00 |
| 6. |
Contractor‑‑fail to apply for assistant well technician identification card |
4(1)(4)(i) |
$100.00 |
| 7. |
Contractor‑‑fail to apply for renewal of identification card |
4(1)(4)(ii) |
$100.00 |
| 8. |
Technician‑‑supervise operation of more than 2 pieces of equipment at one time |
7(1) |
$200.00 |
| 9. |
Technician‑‑well construction not authorized by licence |
7(2) |
$200.00 |
| 10. |
Technician‑‑fail to produce copy of licence |
7(3) |
$100.00 |
| 11. |
Fail to affix visible, legible identification marker to equipment |
10 |
$100.00 |
| 12. |
Fail to have available record of construction and testing of well |
11(2) |
$200.00 |
| 13. |
Fail to cover upper open end of well securely |
11(3) |
$200.00 |
| 14. |
Fail to provide water sample to owner |
11(4)(a) |
$200.00 |
| 15. |
Fail to measure well depth in presence of owner |
11(4)(b) |
$200.00 |
| 16. |
Fail to test yield of well |
11(5)(a) |
$200.00 |
| 17. |
Fail to complete well record in Form 9 |
11(5)(b) |
$100.00 |
| 18. |
Fail to provide copy of well record to owner |
11(5)(c) |
$100.00 |
| 19. |
Fail to provide copy of well record to Director |
11(5)(d) |
$100.00 |
| 20. |
Fail to retain copy of well record for two years |
11(5)(e) |
$100.00 |
| 21. |
Fail to notify owner‑‑well not sand‑free |
11(6) |
$200.00 |
| 22. |
Fail to note on well record‑‑well not sand‑free |
11(6) |
$100.00 |
| 23. |
Flowing well‑‑fail to install device controlling discharge of water |
11(7)(a) |
$200.00 |
| 24. |
Flowing well‑‑fail to construct well to prevent uncontrolled flow |
11(7)(b) |
$200.00 |
| 25. |
Fail to ensure proper surface drainage around well |
11(10) |
$200.00 |
| 26. |
Distance between well site and pollution source less than required |
12(1) |
$300.00 |
| 27. |
Drilled well site‑‑less than 15 metres from pollution source |
12(2) |
$300.00 |
| 28. |
Well other than drilled well site‑‑less than 30 metres from pollution source |
12(3) |
$300.00 |
| 29. |
Well site‑‑not adequately accessible |
12(4) |
$200.00 |
| 30. |
Board or dug well site‑‑below elevation of immediate surrounding area |
12(5) |
$200.00 |
| 31. |
Well pit‑‑inadequate drainage or automatic pumping provisions |
12(6) |
$200.00 |
| 32. |
Casing made of improper material |
13(1) |
$200.00 |
| 33. |
Length of casing inadequate for overburden aquifer |
13(2) |
$200.00 |
| 34. |
Length of casing inadequate for bedrock aquifer |
13(3) |
$200.00 |
| 35. |
Casing not properly placed into the bedrock |
13(3) |
$200.00 |
| 36. |
Length of casing less than 6 metres |
13(4) |
$200.00 |
| 37. |
Fail to comply with minimum casing thickness specifications |
13(5) |
$200.00 |
| 38. |
Casing joints inadequate to prevent entry of undesirable substances |
13(6) |
$300.00 |
| 39. |
Annular overlap space inadequately sealed |
13(7) |
$300.00 |
| 40. |
Drilled well‑‑less than 6 metres deep |
14(1)(a) |
$200.00 |
| 41. |
Drilled well‑‑construction less than 3 metres deep |
14(1)(b) |
$200.00 |
| 42. |
Drilled well‑‑diameter less than required |
14(1)(b) |
$200.00 |
| 43. |
Drilled well‑‑annular space at prescribed depth not filled with suitable material |
14(1)(c) |
$300.00 |
| 44. |
Drilled well‑‑annular space to land surface not filled with suitable material |
14(1)(d) |
$300.00 |
| 45. |
Drilled well‑‑bedrock less than 3 metres down‑‑annular space in bedrock not filled with suitable material |
14(1)(e) |
$300.00 |
| 46. |
Drilled well‑‑bedrock less than 3 metres down‑‑annular space to land surface not filled with suitable material |
14(1)(e) |
$300.00 |
| 47. |
Diamond drilled well‑‑bedrock at least 6 metres down‑‑well less than 6 metres deep |
14(2) |
$200.00 |
| 48. |
Diamond drilled well‑‑bedrock at least 6 metres down‑‑construction less than 3 metres deep |
14(2) |
$200.00 |
| 49. |
Diamond drilled well‑‑bedrock at least 6 metres down‑‑diameter less than required |
14(2) |
$200.00 |
| 50. |
Diamond drilled well‑‑bedrock at least 6 metres down‑‑annular space at prescribed depth not filled with suitable material |
14(2) |
$200.00 |
| 51. |
Diamond drilled well‑‑bedrock at least 6 metres down‑‑annular space to land surface not filled with suitable material |
14(2) |
$300.00 |
| 52. |
Diamond drilled well‑‑bedrock less than 6 metres down‑‑less than 6 metres deep |
14(3)(a) |
$200.00 |
| 53. |
Diamond drilled well‑‑bedrock less than 6 metres down‑‑diameter from land surface to bedrock less than required |
14(3)(b) |
$200.00 |
| 54. |
Diamond drilled well‑‑bedrock less than 6 metres down‑‑portion in bedrock not properly sealed to 6 metre depth |
14(3)(c) |
$300.00 |
| 55. |
Diamond drilled well‑‑bedrock less than 6 metres down‑‑grout not allowed to set |
14(3)(c) |
$300.00 |
| 56. |
Diamond drilled well‑‑bedrock less than 6 metres down‑‑annular space to land surface not filled with suitable material |
14(3)(d |
$300.00 |
| 57. |
Bored or dug well more than 2.5 metres deep‑‑casing joints from land surface to 2.5 metre depth not adequately sealed |
14(4)(a) |
$300.00 |
| 58. |
Bored or dug well more than 2.5 metres deep‑‑annular space below 2.5 metres not filled with suitable material |
14(4)(b) |
$300.00 |
| 59. |
Bored or dug well more than 2.5 metres deep‑‑annular space above 2.5 metres not filled with suitable material |
14(4)(c) |
$300.00 |
| 60. |
Bored or dug well 2.5 metres deep or less‑‑casing joints from land surface to 1 metre depth not adequately sealed |
14(5)(a) |
$300.00 |
| 61. |
Bored or dug well 2.5 metres deep or less‑‑annular space below 1 metre not filled with suitable material |
14(5)(b) |
$300.00 |
| 62. |
Bored or dug well 2.5 metres deep or less‑‑annular space above 1 metre not filled with suitable material |
14(5)(c) |
$300.00 |
| 63. |
Drilled well through bored or dug well‑‑not meeting casing requirements of Section 13 |
14(6)(a) |
$300.00 |
| 64. |
Drilled well through bored or dug well‑‑casing not extending to adequate level below land surface |
14(6)(b) |
$200.00 |
| 65. |
Drilled well through bored or dug well‑‑annular space at bottom of bored or dug well not filled with suitable material |
14(6)(c) |
$300.00 |
| 66. |
Drilled well through bored or dug well‑‑annular space to top of casing not filled with suitable material |
14(6)(d) |
$300.00 |
| 67. |
Drilled well through bored or dug well‑‑not meeting casing requirements of Section 13 |
14(7)(a) |
$200.00 |
| 68. |
Drilled well through bored or dug well‑‑annular space at bottom of bored or dug well not filled with suitable material |
14(7)(a) |
$300.00 |
| 69. |
Drilled well through bored or dug well‑‑casing not extending to adequate level below land surface |
14(7)(b) |
$200.00 |
| 70. |
Drilled well through bored or dug well‑‑not meeting casing requirements of Subsection 14(4) or (5) |
14(7)(c) |
$200.00 |
| 71. |
Fail to chlorinate water in completed well for 12 hours at concentration of 250 mg/1 chlorine |
15(1) |
$300.00 |
| 72. |
Fail to maintain adequate contact between chlorinated water and pumping equipment |
15(2)(a) |
$300.00 |
| 73. |
Fail to pump chlorinated water from well |
15(2)(b) |
$200.00 |
| 74. |
Connection to drilled well casing below ground‑‑fail to use well seal or pitless adapter |
17(1) |
$200.00 |
| 75. |
Connection to drilled well casing below ground not watertight |
17(1) |
$300.00 |
| 76. |
Connection to bored or dug well casing below ground not watertight |
17(2)(a) |
$300.00 |
| 77. |
Connection to bored or dug well casing below ground‑‑outside trench excavation not filled with suitable material |
17(2)(b) |
$200.00 |
| 78. |
Pumping equipment installed in drilled well without casing sealed with commercially manufactured well cap |
17(3) |
$200.00 |
| 79. |
Vertical turbine pump installed‑‑ casing not extended adequately |
17(4)(a) |
$200.00 |
| 80. |
Vertical turbine pump installed ‑top of casing not adequately shielded |
17(4)(b) |
$200.00 |
| 81. |
Drilled well casing less than 12.7 cm.‑‑air vent diameter less than 0.3 cm. |
18(a) |
$100.00 |
| 82. |
Drilled well casing greater than 12.7 cm.‑‑air vent diameter less than 1.2 cm. |
18(b) |
$100.00 |
| 83. |
Fail to extend air vent to within 15 cm. of well pit top |
18(c) |
$100.00 |
| 84. |
Fail to extend air vent sufficient distance above land surface |
18(d) |
$200.00 |
| 85. |
Fail to shield and screen air vent to prevent entry of materials into well |
18(e) |
$200.00 |
| 86. |
Fail to extend air vent to atmosphere to disperse natural gas |
18(f) |
$200.00 |
| 87. |
Testing well yield‑‑fail to record water level before and during pumping in Form 9 |
19(1)(a) |
$200.00 |
| 88. |
Testing well yield‑‑fail to measure water level by tape, air line or electrical device |
19(1)(b) |
$150.00 |
| 89. |
Testing well yield‑‑fail to pump well continuously for one hour |
19(1)(c) |
$200.00 |
| 90. |
Testing well yield‑‑fail to record rate of pumping in Form 9 |
19(1)(d) |
$100.00 |
| 91. |
Testing well yield‑‑pumping less than hour‑‑fail to record reason in Form 9 |
19(2)(a) |
$100.00 |
| 92. |
Testing well yield‑‑pumping less than hour‑‑fail to record rate and length of pumping in Form 9 |
19(2)(b) |
$100.00 |
| 93. |
Testing well yield‑‑pumping less than hour‑‑fail to record water level measurements in Form 9 |
19(2)(c) |
$100.00 |
| 94. |
Testing well yield‑‑bailing or pumping‑‑fail to record water level in Form 9 before and after test |
19(3)(a) |
$100.00 |
| 95. |
Testing well yield‑‑bailing or pumping‑‑fail to measure water level by tape, air line or electrical device |
19(3)(b) |
$100.00 |
| 96. |
Testing well yield‑‑fail to bail or pump continuously for one hour |
19(3)(c) |
$100.00 |
| 97. |
Testing well yield‑‑fail to record rate of bailing or pumping in Form 9 |
19(3)(d) |
$100.00 |
| 98. |
Testing well yield less than one hour‑‑fail to record reason in Form 9 |
19(4)(a) |
$100.00 |
| 99. |
Testing well yield less than one hour‑‑fail to record rate and length of bailing or pumping in Form 9 |
19(4)(b) |
$100.00 |
| 100. |
Fail to notify well owner immediately that mineralized water encountered |
20(1) |
$200.00 |
| 101. |
Fail to notify well owner immediately that natural gas encountered |
20(2) |
$200.00 |
| 102. |
Fail to notify Director immediately that natural gas encountered |
20(2) |
$200.00 |
| 103. |
Well owner‑‑fail to maintain well adequately to prevent entry of surface water or other material |
20(3) |
$200.00 |
| 104. |
Fail to adequately plug abandoned well |
21(1) |
$200.00 |
| 105. |
Well owner‑‑fail to abandon new dry well forthwith |
21(2) |
$200.00 |
| 106. |
Well owner‑‑fail to abandon forthwith well not in use |
21(3) |
$200.00 |
| 107. |
Well owner‑‑fail to abandon forthwith well not being maintained for future use |
21(3) |
$200.00 |
| 108. |
Well owner‑‑fail to abandon forthwith well producing non‑potable water |
21(4) |
$200.00 |
| 109. |
Well owner‑‑fail to abandon well forthwith at direction of Director |
21(5) |
$300.00 |