Item | Offence | Section | Set Fine |
---|---|---|---|
0.1 | Fail to ensure all equipment used in drilling a well is in good condition and adequate. | 3.1 (a) | $500.00 |
0.2 | Fail to prevent the migration of oil, gas or water from one horizon to another. | 3.1 (b) | $750.00 |
0.3 | Fail to properly handle or dispose of all fluids produced or recovered | 3.1 (c) | $500.00 |
0.4 | Fail to properly handle or dispose of fluids or refuse from a well | 3.1 (d) | $500.00 |
1. | Drill a well with a surface location in a restricted drilling area | 3.1.1 | $400.00 |
2. | Fail to construct sumps or pits or to provide tanks prior to spudding | 3.2 | $400.00 |
3. | Fail to install temporary fencing around sump | 3.2.1 (a) | $200.00 |
4. | Fail to install a impervious liner | 3.2.1 (b) | $200.00 |
5. | Fail to maintain fluid levels 0.5 metres below base of dike | 3.2.1 (c) | $200.00 |
6. | Fail to use proper liner in earthen sump or pit | 3.2.2 | $200.00 |
7. | Fail to close earthen sump or pit within 6 months of TD date | 3.3 | $500.00 |
8. | Fail to isolate formations from contamination caused by migration of fluids | 3.4 (c) | $750.00 |
9. | Fail to prevent migration of fluids to surface or sub-surface | 3.4 (d) | $750.00 |
10. | Fail to prevent shale and unconsolidated material from falling into open hole during drilling | 3.4 (e) | $250.00 |
11. | Improper removal of casing during drilling | 3.5.1 | $450.00 |
12. | Improper removal of casing from a producing well | 3.5.1.1 | $450.00 |
13. | Fail to have proper hole size for casing when sealing well | 3.5.2 | $250.00 |
14. | Fail to have proper annular clearance between casings | 3.5.3 | $250.00 |
15. | Fail to record history of used casing | 3.6 (a) | $400.00 |
16. | Fail to examine condition of thread on pipe and inside collars of used casings | 3.6 (b) | $400.00 |
17. | Fail to examine condition of pipe near threads and casing collars of used casings | 3.6 (c) | $400.00 |
18. | Fail to conduct wall thickness measurements on joints of used casings | 3.6 (d) | $400.00 |
19. | Fail to conduct a hydrostatic pressure test on used casings | 3.6 (e) | $400.00 |
20. | Fail to guide casing properly into hole | 3.7 (a) | $250.00 |
21. | Fail to apply correct casing torque or thread standoff | 3.7 (b) | $250.00 |
22. | Fail to clean threads and examine casing | 3.7 (c) | $250.00 |
23. | Fail to examine and clear casing of internal obstructions | 3.7 (d) | $250.00 |
24. | Fail to use thread compound on casing joints | 3.7 (e) | $250.00 |
25. | Fail to pressure test all joints in the string | 3.7 (f) | $250.00 |
26. | Fail to protect all potable water formations | 3.9 (a) | $700.00 |
27. | Fail to protect potential hydrocarbon-bearing zones | 3.9 (b) | $700.00 |
28. | Fail to protect casings from fluid bearing formations | 3.9 (c) | $400.00 |
28.1 | Fail to meet cement quality | 3.9.2(a) | $750.00 |
28.2 | Fail to comply with API publication for selecting correct cement grade | 3.9.2(b) | $750.00 |
28.3 | Fail to ensure cement correctly mixed and pumped | 3.9.2(b) | $500.00 |
29. | Fail to ensure cement quality by providing Examiner on site | 3.9.2 (c) | $450.00 |
30. | Fail to run conductor casing where water flows occur close to surface | 3.10 | $450.00 |
31. | Fail to ensure conductor casing is of sufficient weight and quality | 3.10.1 (a) | $450.00 |
32. | Fail to ensure hole is dry and monitored prior to resumption of drilling | 3.10.1 (b) | $450.00 |
33. | Fail to squeeze cement to isolate fresh water zone where water flow not stopped | 3.10.1 (c) | $450.00 |
34. | Recover conductor casing prior to cementing next string | 3.10.1 (d) | $450.00 |
35. | Fail to permanently isolate and protect potable water | 3.11 (a) | $500.00 |
36. | Fail to prevent cross-flow between fluid bearing zones | 3.11 (b) | $500.00 |
37. | Fail to prevent sloughing of unconsolidated material into well bore | 3.11 (c) | $500.00 |
38. | Fail to anchor well control equipment | 3.11 (d) | $500.00 |
39. | Fail to cement surface casing | 3.11.1 | $500.00 |
40. | Fail to drill surface hole sufficiently deep into bedrock | 3.11.2 | $500.00 |
41. | Fail to run a string of casing above the artesian fresh water zone | 3.11.3 | $500.00 |
42. | Fail to cement surface casing before drilling | 3.11.4 | $500.00 |
43. | Fail to cement surface casing full length | 3.11.4 (a) | $500.00 |
44. | Fail to use proper excess cement volume | 3.11.4 (b) | $500.00 |
45. | Fail to cement surface casing using circulation method | 3.11.4 (c) | $500.00 |
46. | Fail to monitor annular flow for cement returns | 3.11.5 | $500.00 |
47. | Fail to ensure surface casing cement complies with API Specification 10 | 3.11.6 | $500.00 |
48. | Fail to ensure surface casing cement retains 5 metres of tail cement | 3.11.7 | $500.00 |
49. | Fail to pre-flush before pumping cement into casing | 3.11.8 | $500.00 |
50. | Fail to obtain slurry samples during cementing operation | 3.11.9 | $500.00 |
51. | Fail to determine WOC (Wait on Cement) time | 3.11.10 | $500.00 |
52. | Commence drill-out operation before cement attains 3600 kPa compressive strength | 3.11.10 | $500.00 |
53. | Fail to conduct casing pressure test before cement drilled out of shoe joint | 3.11.11 | $500.00 |
54. | Fail to conduct remedial work if casing fails pressure test | 3.11.11 | $500.00 |
55. | Fail to conduct pressure integrity test | 3.11.12 | $500.00 |
56. | Fail to use a low volume, high pressure pump for pressure integrity test | 3.11.12 (a) | $500.00 |
57. | Apply incorrect pressure during pressure integrity test | 3.11.12 (a) | $500.00 |
58. | Fail to conduct pressure integrity test for ten minutes | 3.11.12 (b) | $500.00 |
59. | Fail to use an incompressible fluid in pressure integrity test | 3.11.12 (c) | $500.00 |
60. | Fail to record test data in pressure integrity test | 3.11.12 (d) | $500.00 |
61. | Fail to conduct remedial work when casing seat fails pressure integrity test | 3.11.13 | $500.00 |
62. | Fail to use intermediate casing and cement to protect equipment and formations from excessive pressures | 3.12 (a) | $500.00 |
63. | Fail to use intermediate casing and cement to prevent fluid migration | 3.12 (b) | $500.00 |
64. | Fail to use intermediate casing and cement to prevent material from falling into open hole | 3.12 (c) | $500.00 |
65. | Fail to control the target zone pressure | 3.12 (d) | $500.00 |
66. | Fail to set and cement intermediate casing prior to drilling | 3.12.1 | $500.00 |
67. | Fail to cement casing when aquifer is present | 3.12.2 | $500.00 |
68. | Fail to identify all oil, gas and fluid bearing zones when drilling | 3.12.3 (a) | $500.00 |
69. | Fail to pump cement to separate all oil, gas and fluid bearing zones | 3.12.3 (b) | $500.00 |
70. | Fail to ensure cement in casing annulus rises 25 metres above previous casing seat | 3.12.3 (c) | $500.00 |
71. | Fail to provide an Examiner to certify isolation of all porous zones | 3.12.3 (d) | $550.00 |
72. | Fail to seal or plug the lost circulation zone prior to or during the cementing of the casing | 3.12.4 | $500.00 |
73. | Fail to cement by circulation method to 25 metres above last casing seat | 3.12.5 | $500.00 |
74. | Fail to conduct remedial cementing to isolate all porous zones | 3.12.5.1 | $500.00 |
75. | Fail to utilize correct cement volume | 3.12.6 | $500.00 |
76. | Fail to use sulphate-resistant casing cement | 3.12.7 | $500.00 |
77. | Fail to run 5 metre long shoe joint | 3.12.8 | $500.00 |
78. | Fail to wait on cement for 6 hours before starting drill-out operation | 3.12.9 | $500.00 |
79. | Fail to conduct casing pressure test before cement drilled out of shoe joint | 3.12.10 | $500.00 |
80. | Fail to conduct a low pressure test before cement drilled out of shoe joint | 3.12.10 (a) | $500.00 |
81. | Fail to conduct a high pressure test before cement drilled out of shoe joint | 3.12.10 (b) | $500.00 |
82. | Fail conduct remedial work where casing fails pressure test | 3.12.10 | $500.00 |
83. | Fail to install and test spool, casing valve and BOP equipment with intermediate casing string | 3.12.11 | $500.00 |
84. | Fail to conduct pressure integrity test after drilling cement in shoe joint | 3.12.12 | $650.00 |
85. | Fail to use low volume, high pressure pump in pressure integrity test | 3.12.12 (a) | $650.00 |
86. | Fail to apply proper pressure on formation in pressure integrity test | 3.12.12 (b) | $650.00 |
87. | Fail to apply pressure for 10 minutes in pressure integrity test | 3.12.12 (c) | $650.00 |
88. | Fail to use incompressible fluid in pressure integrity test | 3.12.12 (d) | $650.00 |
89. | Fail to record type and gradient of incompressible fluid in pressure integrity test | 3.12.12 (e) (i) | $200.00 |
90. | Fail to record duration of pressure integrity test | 3.12.12 (e) (ii) | $200.00 |
91. | Fail to record initial pressure in pressure integrity test | 3.12.12 (e) (iii) | $200.00 |
92. | Fail to record final pressure in pressure integrity test | 3.12.12 (e) (iv) | $200.00 |
93. | Fail to protect equipment and formations with cemented production casing | 3.13 | $400.00 |
93.1 | Fail to run a gamma ray log within 30 days of well’s TD date | 3.13.1(a) | $700.00 |
93.2 | Fail to run a neutron log within 30 days of well’s TD date | 3.13.1(b) | $700.00 |
93.3 | Fail to install all wellhead equipment in compliance with API Spec 6A | 3.13.2 | $700.00 |
94. | Fail to install a well control device capable of closing around the cable prior to drilling | 3.13.4 (a) (i) | $700.00 |
95. | Fail to install a well control device with remote controls | 3.13.4 (a) (ii) | $700.00 |
96. | Fail to perform daily function test of well control device | 3.13.4 (b) | $500.00 |
97. | Fail to ensure all lubricator components can handle pressure | 3.13.4 (c) | $500.00 |
98. | Fail to specify when lubricator system is employed | 3.13.4 (d) | $500.00 |
99. | Fail to use full lubricator system | 3.13.4 (e) | $500.00 |
100. | Fail to properly install rotary head to BOP system | 3.13.5 | $500.00 |
101. | Fail to cement production casing 25 metres above previous casing seat | 3.13.6 | $500.00 |
102. | Fail to cement production casing 25 metres above corrosive zone | 3.13.6 (a) | $500.00 |
103. | Fail to cement production casing liner over its full length | 3.13.6 (b) | $500.00 |
104. | Fail to cement production casing to surface in wells located in water-covered areas | 3.13.6 (d) | $500.00 |
105. | Fail to provide an Examiner to certify cement tops | 3.13.6 | $450.00 |
106. | Fail to isolate porous zones by remedial cementing | 3.13.6.1 | $400.00 |
107. | Fail to use 30 per cent excess volume of cement based on theoretical calculation | 3.13.7 (a) | $400.00 |
108. | Fail to use 20 per cent excess volume of cement based on calliper volume determination | 3.13.7 (b) | $400.00 |
109. | Fail to use proper quality and temperature of water when mixing cement | 3.13.8 (a) | $400.00 |
110. | Fail to run a 5 metre casing shoe joint to retain tail cement | 3.13.8 (b) | $400.00 |
111. | Fail to cement by displacement method and use a wiper plug to separate cement | 3.13.9 (a) | $400.00 |
112. | Fail to provide a positive stop to cement displacement | 3.13.9 (b) | $400.00 |
113. | Fail to remove drilling fluid and filter cake and improve cement bond | 3.13.9 (c) | $400.00 |
114. | Fail to use wall cleaners or scratchers to improve cement bond | 3.13.9 (d) | $400.00 |
115. | Fail to run centralizers at proper locations | 3.13.10 | $400.00 |
116. | Fail to pump sufficient volume of neat tail cement | 3.13.11 (a) | $400.00 |
117. | Fail to ensure tail cement is equal in quality to neat cement | 3.13.11 (b) | $400.00 |
118. | Fail to use remedial cementing techniques where potential for hydrostatic communication between formations | 3.13.12 | $400.00 |
119. | Fail to retain records of remedial cementing | 3.13.13 | $200.00 |
119.1 | Fail to run cement bond log | 3.13.13 | $700.00 |
119.2 | Fail to comply with API Spec 6A for surface equipment | 3.14 | $700.00 |
120. | Fail to install a casing head or spool prior to completing well | 3.14 (a) | $400.00 |
121. | Fail to provide a wellhead to isolate the annulus at surface prior to completing well | 3.14 (b) | $400.00 |
122. | Fail to install a tubing head or tubing spool prior to completing well | 3.14 (c) | $400.00 |
123. | Drilling and cementing records — fail to keep on file the size, type, grade and weight of casing | 3.15 (a) | $200.00 |
124. | Drilling and cementing records — fail to keep on file the names of the manufacturer and supplier | 3.15 (b) | $200.00 |
125. | Drilling and cementing records — fail to keep on file a casing tally | 3.15 (c) | $200.00 |
126. | Drilling and cementing records — fail to keep on file whether casing was new or used | 3.15 (d) | $200.00 |
127. | Drilling and cementing records — fail to keep on file the history of use for used casing | 3.15 (e) | $200.00 |
128. | Drilling and cementing records — fail to keep on file the setting depth | 3.15 (f) | $200.00 |
129. | Drilling and cementing records — fail to keep on file description of operational problems while running casing | 3.15 (g) | $200.00 |
130. | Drilling and cementing records — fail to keep on file the cementing company name | 3.16 (a) | $200.00 |
131. | Drilling and cementing records — fail to keep on file the cement blends used | 3.16 (b) | $200.00 |
132. | Drilling and cementing records — fail to keep on file the source of mix water | 3.16 (c) | $200.00 |
133. | Drilling and cementing records — fail to keep on file type and volume of any preflush | 3.16 (d) | $200.00 |
134. | Drilling and cementing records — fail to keep on file volumes of cement | 3.16 (e) | $200.00 |
135. | Drilling and cementing records — fail to keep on file cement slurry density | 3.16 (f) | $200.00 |
136. | Drilling and cementing records — fail to keep on file actual displacement volume | 3.16 (g) | $200.00 |
137. | Drilling and cementing records — fail to keep on file final displacement pressure | 3.16 (h) | $200.00 |
138. | Drilling and cementing records — fail to keep on file any cement movement techniques | 3.16 (i) | $200.00 |
139. | Drilling and cementing records — fail to keep on file cement returns with estimate of volume | 3.16 (j) | $200.00 |
140. | Drilling and cementing records — fail to keep on file float equipment and casing attachments | 3.16 (k) | $200.00 |
141. | Drilling and cementing records — fail to keep on file results of every pressure test | 3.16 (l) | $200.00 |
142. | Drilling and cementing records — fail to keep on file cement tops and their identification | 3.16 (m) | $200.00 |
143. | Drilling and cementing records — fail to keep on file description of any operational problems | 3.16 (n) | $200.00 |
144. | Drilling and cementing records — fail record and keep on file a copy of cement bond logs | 3.16 (o) | $200.00 |
145. | Fail to keep on site records that include depth at start of day or shift | 3.17 (a) | $200.00 |
146. | Fail to keep on site records that include depth at end of day or shift | 3.17 (b) | $200.00 |
147. | Fail to keep on site records that include diameter of the hole | 3.17 (c) | $200.00 |
148. | Fail to keep on site records that include any change in casing program | 3.17 (d) | $200.00 |
149. | Fail to keep on site records that include setting depth, casing size, type, grade and weight | 3.17 (e) | $200.00 |
150. | Fail to keep on site records that include new or used casing | 3.17 (f) | $200.00 |
151. | Fail to keep on site records that include a description of all cement jobs | 3.17 (g) | $200.00 |
152. | Fail to keep on site records that include pressure tests and results | 3.17 (h) | $200.00 |
153. | Fail to keep on site records that include the depth of all shows of oil, gas or water | 3.17 (i) | $200.00 |
154. | Fail to keep on site records that include the depth of lost circulation zones | 3.17 (j) | $200.00 |
155. | Fail to keep on site records that include a description of related operations | 3.17 (k) | $200.00 |
156. | Drilling samples — fail to collect at 3 metre intervals from vertical or deviated portion of wellbore | 3.18 (a) (i) | $250.00 |
157. | Drilling samples — fail to collect at 6 metre intervals from horizontal portion of wellbore | 3.18 (a) (ii) | $250.00 |
158. | Drilling samples — fail to bag, dry and label sample bags | 3.18 (b) (i) | $250.00 |
159. | Drilling samples — fail to wash, dry and label sample vials | 3.18 (b) (ii) | $250.00 |
160. | Drilling samples — fail to provide samples recovered from a well | 3.18 (c) | $250.00 |
161. | Site rehabilitation — fail to clear area around well of all refuse material | 3.19 (a) | $700.00 |
162. | Site rehabilitation — fail to dispose of all liquid and solid waste in a safe manner | 3.19 (b) | $700.00 |
163. | Site rehabilitation — fail to fill in excavations | 3.19 (c) | $700.00 |
164. | Site rehabilitation — fail to clean pits of salt and chemicals that inhibit plant growth | 3.19 (d) | $700.00 |
165. | Site rehabilitation — fail to remove concrete bases, machinery and materials | 3.19 (e) | $500.00 |
166. | Site rehabilitation — fail to level and restore site to original condition | 3.19 (f) | $500.00 |
167. | Site rehabilitation — fail to provide an Examiner to visit site and certify rehabilitation and plugging properly completed | 3.19 (g) | $450.00 |
167.1 | Commence drilling in Lake Erie prior to April 1 or after October 31 | 3.20 (a) | N.S.F. |
168. | Water covered area — fail to cement all casings to lake bed | 3.20 (b) | $700.00 |
169. | Water covered area — fail to monitor for oil and liquid hydrocarbons | 3.20 (c) | $500.00 |
170. | Water covered area — fail to use fresh water drilling fluids only | 3.20 (e) | $500.00 |
171. | Water covered area — fail to have onboard tanks to contain all drilling fluids | 3.20 (f) | $500.00 |
172. | Water covered area — fail to reduce turbidity when returning drill cuttings to lake bed | 3.20 (g) | $400.00 |
173. | Water covered area — fail to prepare and submit contingency plan | 3.20.1 | $400.00 |
174. | Water covered area — fail to include emergency definitions in contingency plan | 3.20.1 (a) | $400.00 |
175. | Water covered area — fail to include written instructions for response and mitigation in contingency plan | 3.20.1 (b) | $400.00 |
176. | Water covered area — fail to include emergency response organizations and responsibilities for actions in contingency plan | 3.20.1 (c) | $400.00 |
177. | Water covered areas — fail to include locations, access routes or directions to all works in contingency plan | 3.20.1 (d) | $400.00 |
178. | Water covered areas — fail to list resources, supplies and equipment required for response and mitigation in contingency plan | 3.20.1 (e) | $400.00 |
179. | Water covered areas — fail to include contact lists for personnel, public bodies and equipment suppliers in contingency plan | 3.20.1 (f) | $400.00 |
180. | Water covered areas — fail to include incident assessment and reporting procedures in contingency plan | 3.20.1 (g) | $400.00 |
181. | Water covered areas — fail to conduct regular emergency response drills | 3.20.2 | $400.00 |
182. | Fail to install and maintain adequate BOP equipment during drilling | 4.1 | $700.00 |
183. | Fail to have proper flanges on casing bowl or spool to which BOP attached | 4.4.1 (a) | $700.00 |
184. | Fail to have at least one valve on casing bowl or spool to which BOP equipment attached | 4.4.1 (b) | $700.00 |
185. | Fail to connect BOP to an accumulator system where hydraulic operation | 4.4.3 | $400.00 |
186. | Fail to locate wheel used to close blowout preventer 5 metres from rig floor and to secure shaft to preventer where mechanical operation of BOP | 4.4.4 | $400.00 |
187. | Fail to install and operate accumulator system to manufacturer’s specifications | 4.4.5 (a) | $400.00 |
188. | Fail to ensure accumulator can provide fluid of sufficient volume and pressure | 4.4.5 (b) | $400.00 |
189. | Fail to connect accumulator properly to BOP | 4.4.5 (c) | $400.00 |
190. | Fail to ensure accumulator system is recharged by pump | 4.4.5 (d) | $400.00 |
191. | Fail to ensure accumulator system can close ram blowout preventer within 30 seconds | 4.4.5 (e) | $400.00 |
192. | Fail to ensure accumulator system can close annular blowout preventer within 90 seconds | 4.4.5 (f) | $400.00 |
193. | Fail to ensure accumulator system is equipped with gauges | 4.4.5 (g) | $400.00 |
194. | Fail to ensure accumulator system is equipped with check valve | 4.4.5 (h) | $400.00 |
195. | Fail to ensure nitrogen supply is connected to accumulator system | 4.4.6 | $400.00 |
196. | Fail to have adequate nitrogen supply | 4.4.6 (a) | $400.00 |
197. | Fail to maintain nitrogen supply at 12,500 kPa | 4.4.6 (b) | $400.00 |
198. | Fail to install or have available pressure gauge to measure nitrogen pressure | 4.4.6 (c) | $400.00 |
199. | Fail to install hand wheels on ram preventers | 4.4.7 | $400.00 |
200. | Fail to install operating controls for hydraulically operated BOP system | 4.4.8 | $400.00 |
201. | Kill systems — fail to install an inlet below BOP | 4.4.9 | $400.00 |
202. | Kill systems — fail to install proper size inlet below BOP | 4.4.9 (a) | $400.00 |
203. | Kill systems — fail to install nipple, valve and kill line for Class B wells | 4.4.9 (b) | $400.00 |
204. | Kill systems — fail to install kill line components with proper pressure rating | 4.4.9 (c) | $400.00 |
205. | Kill systems — fail to install separate lines for kill fluids | 4.4.9 (d) | $400.00 |
206. | Bleed-off system — fail to install bleed-off outlet below BOP | 4.4.10 | $400.00 |
207. | Bleed-off system — fail to install proper size outlet | 4.4.10 (a) | $400.00 |
208. | Bleed-off system — fail to install proper nipple, valve and bleed-off line for Class B wells | 4.4.10 (b) | $400.00 |
209. | Bleed-off system — fail to have proper pressure rating for bleed-off line | 4.4.10 (c) | $400.00 |
210. | Bleed-off system — fail to attach separate lines to named equipment | 4.4.10 (d) | $400.00 |
211. | Flexible hose — fail to install hose with proper pressure rating | 4.4.11 (a) | $400.00 |
212. | Flexible hose — fail to install hose with proper internal diameter | 4.4.11 (b) | $400.00 |
213. | Flexible hose — fail to install hose with factory installed connections | 4.4.11 (c) | $400.00 |
214. | Flexible hose — fail to install hose with adequate fire protection sheath | 4.4.11 (d) | $400.00 |
215. | Flexible hose — fail to install hose with manufacturer’s identification | 4.4.11 (e) | $400.00 |
216. | Flexible hose — fail to install flexible hose with bends equal to or greater than manufacturer’s specifications | 4.4.11 (f) | $400.00 |
217. | Flexible hose — fail to secure flexible hose | 4.4.11 (g) | $400.00 |
218. | Flexible hose — fail to shop service and test | 4.4.11 (h) | $400.00 |
219. | Flexible hose — fail to record test and maintenance data | 4.4.11 (h) | $400.00 |
220. | Fail to conduct a pressure test prior to drilling cement out | 4.4.12 | $400.00 |
221. | Fail to test BOP equipment daily | 4.4.13 | $700.00 |
222. | Fail to service defective BOP equipment | 4.4.13 | $700.00 |
223. | Fail to shop service BOP equipment every 3 years | 4.4.14 | $700.00 |
224. | Fail to record test and maintenance data of BOP equipment | 4.4.14 | $400.00 |
225. | Training — fail to ensure rig crew is trained | 4.4.15 (a) | $700.00 |
226. | Training — fail to ensure that driller is certified | 4.4.15 (b) | $700.00 |
227. | Training — fail to ensure that at least one person is certified | 4.4.15 (c) | $700.00 |
228. | Training — fail to ensure that BOP drills are performed prior to drilling | 4.4.15 (d) | $400.00 |
229. | Training — fail to ensure that BOP drills are performed every seven days | 4.4.15 (e) | $400.00 |
230. | Training — fail to ensure that BOP drills are recorded | 4.4.15 (f) | $400.00 |
231. | Training — fail to post kick control procedures at rig | 4.4.15 (g) | $400.00 |
232. | Fail to use Class A well BOP equipment | 4.5.1 (a) | $500.00 |
233. | Fail to use Class B well BOP equipment | 4.5.1 (b) | $500.00 |
234. | Fail to properly construct drilling-through components | 4.5.2 | $400.00 |
235. | Fail to have flange as part of casing bowl | 4.5.3 (a) | $400.00 |
236. | Fail to ensure casing bowl has one valve | 4.5.3 (b) | $400.00 |
237. | Fail to ensure blowout preventer is hydraulically operated | 4.5.4 | $400.00 |
238. | Fail to install and operate accumulator system to manufacturer’s specifications | 4.5.5 (a) | $400.00 |
239. | Fail to ensure accumulator system maintains pressure | 4.5.5 (b) | $400.00 |
240. | Fail to ensure accumulator system is connected to blowout preventers | 4.5.5 (c) | $400.00 |
241. | Fail to ensure accumulator system is recharged by automatic pump | 4.5.5 (d) | $400.00 |
242. | Fail to ensure accumulator system can close ram blowout preventer | 4.5.5 (e) | $400.00 |
243. | Fail to ensure accumulator system can close annular blowout preventer | 4.5.5 (f) | $400.00 |
244. | Fail to ensure accumulator system can close annular blowout preventer | 4.5.5 (g) | $400.00 |
245. | Fail to ensure accumulator system is equipped with fittings and gauges | 4.5.5 (h) | $400.00 |
246. | Fail to connect accumulator to nitrogen supply | 4.5.6 | $400.00 |
247. | Fail to have adequate nitrogen supply to operate BOP equipment | 4.5.6 (a) | $400.00 |
248. | Fail to have nitrogen supply at 12,500 kPa | 4.5.6 (b) | $400.00 |
249. | Fail to install or have available gauge to measure nitrogen pressure | 4.5.6 (c) | $400.00 |
250. | Fail to have hand wheels for ram type blowout preventers | 4.5.7 | $400.00 |
251. | Fail to include operating controls for each blowout preventer | 4.5.8 (a) | $400.00 |
252. | Fail to include additional controls to close and open valve | 4.5.8 (b) (i) | $400.00 |
253. | Fail to include additional controls 15 metres from well | 4.5.8 (b) (ii) | $400.00 |
254. | Fail to include readily accessible and protected additional controls | 4.5.8 (b) (iii) | $400.00 |
255. | Fail to include a kill system | 4.5.9 | $400.00 |
256. | Fail to have proper pressure rating of kill system | 4.5.9 (a) | $400.00 |
257. | Fail to include kill line connecting mud line to drilling spool | 4.5.9 (b) | $400.00 |
258. | Fail to include a valved kill system to isolate kill line from stand pipe | 4.5.9 (c) | $400.00 |
259. | Fail to include kill system with two flanged valves on drilling spools | 4.5.9 (d) | $400.00 |
260. | Fail to include kill system with 50 millimetres diameter | 4.5.9 (e) | $400.00 |
261. | Fail to install flexible hose with proper pressure rating | 4.5.10 (a) | $400.00 |
262. | Fail to install flexible hose with proper diameter | 4.5.10 (b) | $400.00 |
263. | Fail to install flexible hose with proper connections | 4.5.10 (c) | $400.00 |
264. | Fail to install flexible hose with proper sheathing | 4.5.10 (d) | $400.00 |
265. | Fail to install flexible hose with proper markings | 4.5.10 (e) | $400.00 |
266. | Fail to install flexible hose with proper bending radius | 4.5.10 (f) | $400.00 |
267. | Fail to secure flexible hose | 4.5.10 (g) | $400.00 |
268. | Fail to shop service flex hose every 3 years | 4.5.10 (h) | $400.00 |
269. | Fail to record flexible hose test and maintenance data | 4.5.10 (h) | $400.00 |
270. | Fail to ensure Class B bleed-off system valves have proper pressure rating | 4.5.11 (a) | $400.00 |
271. | Fail to ensure Class B bleed-off system contains only straight pipe or 90 degree bends | 4.5.11 (b) | $400.00 |
272. | Fail to ensure Class B bleed-off system is securely tied down | 4.5.11 (c) | $400.00 |
273. | Fail to ensure Class A bleed-off system has proper line with valve | 4.5.12 (a) | $400.00 |
274. | Fail to ensure Class A bleed-off system has proper line to pit 30 metres from well | 4.5.12 (b) | $400.00 |
275. | Fail to ensure Class A bleed-off line is 75 millimetres in diameter | 4.5.13 (a) | $400.00 |
276. | Fail to ensure Class A bleed-off line is connected by proper flanges and unions | 4.5.13 (b) | $400.00 |
277. | Fail to ensure Class A bleed-off line contains 2 valves on drilling spool | 4.5.13 (c) | $400.00 |
278. | Fail to ensure Class A bleed-off line flexible hose conforms to standards | 4.5.13 (d) | $400.00 |
279. | Fail to ensure choke-manifold is properly constructed | 4.5.14 (a) | $400.00 |
280. | Fail to ensure choke-manifold permits flow from well to flare pit | 4.5.14 (b) (i) | $400.00 |
281. | Fail to ensure choke-manifold permits flow from well to lines of proper diameter | 4.5.14 (b) (ii) | $400.00 |
282. | Fail to ensure choke-manifold contains two adjustable chokes | 4.5.14 (c) | $400.00 |
283. | Fail to ensure choke-manifold is constructed with valved outlet | 4.5.14 (d) | $400.00 |
284. | Fail to ensure choke-manifold provides casing pressure | 4.5.14 (e) | $400.00 |
285. | Fail to ensure choke-manifold is constructed to provide flow paths | 4.5.14 (f) | $400.00 |
286. | Fail to ensure choke-manifold is located outside sub-structure | 4.5.14 (g) | $400.00 |
287. | Fail to ensure choke-manifold is protected from freezing | 4.5.14 (h) | $400.00 |
288. | Fail to ensure mud system line is connected to choke line | 4.5.14.1 (a) | $400.00 |
289. | Fail to ensure proper diameter of mud system line | 4.5.14.1 (b) | $400.00 |
290. | Fail to ensure mud system line directs flow through mud-gas separator | 4.5.14.1 (c) | $400.00 |
291. | Fail to ensure bleed-off line from choke manifold to flare pit is proper diameter | 4.5.14.2 (a) | $400.00 |
292. | Fail to ensure bleed-off line from choke manifold to flare pit is 30 meters from well | 4.5.14.2 (b) | $400.00 |
293. | Fail to ensure bleed-off line from choke manifold is in downward direction to earthen pit of 1 metre | 4.5.14.2 (c) (i) | $400.00 |
294. | Fail to ensure walls of earthen pit where choke manifold bleed-off line terminates have proper height | 4.5.14.2 (c) (ii) | $400.00 |
295. | Fail to ensure earthen pit where choke manifold bleed-off line terminates is shaped to contain liquid | 4.5.14.2 (c) (iii) | $400.00 |
296. | Fail to ensure auxiliary choke manifold bleed-off lines have proper diameter | 4.5.14.3 | $400.00 |
297. | Fail to install and maintain a mud-gas separator in mud tank | 4.5.15 (a) | $400.00 |
298. | Fail to install and maintain a warning device in mud tank | 4.5.15 (b) | $400.00 |
299. | Fail to equip drilling mud system with device to measure volume | 4.5.16 | $400.00 |
300. | Fail to ensure hole is filled with proper amount of fluid when pulling pipe from well | 4.5.17 (a) | $400.00 |
301. | Fail to ensure volume of fluid in hole is recorded when pulling pipe from well | 4.5.17 (b) | $400.00 |
302. | Fail to ensure heat is provided to blow out preventer | 4.5.18 (a) | $400.00 |
303. | Fail to ensure bleed-off lines are empty in cold weather | 4.5.18 (b) (i) | $400.00 |
304. | Fail to ensure bleed-off lines are filled with non-freezing fluid in cold weather | 4.5.18 (b) (ii) | $400.00 |
305. | Fail to ensure bleed-off lines are heated in cold weather | 4.5.18 (b) (iii) | $400.00 |
306. | Fail to install and maintain drill string safety valve and a device capable of stopping back flow | 4.5.19 | $400.00 |
307. | Air, gas or foam drilling — fail to install and maintain a rotating head | 4.5.20 (a) (i) | $400.00 |
308. | Air, gas or foam drilling — fail to install and maintain a 30 metre diverter line | 4.5.20 (a) (ii) | $400.00 |
309. | Air, gas or foam drilling — fail to install and maintain a reserve volume of drilling fluid | 4.5.20 (a) (iii) | $400.00 |
310. | Air, gas or foam drilling — fail to install and maintain a hydrogen sulphide monitor | 4.5.20 (a) (iv) | $400.00 |
311. | Air, gas or foam drilling — fail to flare any gas flowing from diverter line | 4.5.20 (b) | $400.00 |
312. | Fail to ensure pressure test on casing and ram type preventer | 4.5.21 (a) | $400.00 |
313. | Fail to ensure pressure test on casing, ram and annular type preventer | 4.5.21 (b) | $400.00 |
314. | Fail to ensure pressure test on casing, ram preventer and bleed-off manifold | 4.5.21 (c) | $400.00 |
315. | Fail to ensure pressure test on casing and each annular preventer | 4.5.21 (d) | $400.00 |
316. | Fail to cease operation when pressure tests not satisfactory | 4.5.21.1 | $400.00 |
317. | Fail to run a casing inspection log | 4.5.22 (a) | $400.00 |
318. | Fail to run a pressure test at weakest section of casing | 4.5.22 (b) | $400.00 |
319. | Fail to test BOP equipment daily | 4.5.23 (a) | $400.00 |
320. | Fail to properly test annular type BOP equipment | 4.5.23 (b) | $400.00 |
321. | Fail to record BOP tests | 4.5.23 (c) | $400.00 |
322. | Fail to service BOP equipment | 4.5.24 | $400.00 |
323. | Fail to ensure rig crew is trained in the operation of BOP equipment | 4.5.25 (a) | $700.00 |
324. | Fail to ensure driller has First Line Supervisor certificate | 4.5.25 (b) | $700.00 |
325. | Fail to ensure at least one person has Second Line Supervisor certificate | 4.5.25 (c) | $700.00 |
326. | Fail to ensure blowout prevention drills conducted prior to drilling | 4.5.25 (d) | $500.00 |
327. | Fail to ensure blowout prevention drills conducted every 7 days | 4.5.25 (e) | $500.00 |
328. | Fail to ensure drills are recorded | 4.5.25 (f) | $400.00 |
329. | Fail to ensure device allows circulation of fluids through drill string | 4.5.26 (a) | $400.00 |
330. | Fail to install remote control master valve on testing head | 4.5.26 (b) | $400.00 |
331. | Fail to ensure well is under control | 4.6 (a) | $700.00 |
332. | Fail to ensure blowout prevention is installed and maintained | 4.6 (b) | $500.00 |
333. | Fail to ensure blowout prevention equipment is installed to specifications | 4.6 (c) | $500.00 |
334. | Fail to ensure blowout prevention pressure rating is proper | 4.6 (d) | $500.00 |
335. | Fail to ensure ram preventers have hand wheels | 4.6 (e) | $400.00 |
336. | Fail to meet Class II servicing requirements | 4.6 (f) | $400.00 |
337. | Fail to install and operate accumulator system to manufacturers specifications | 4.6.4 (a) | $400.00 |
338. | Fail to connect accumulator system to preventer with lines of proper pressure | 4.6.4 (b) | $400.00 |
339. | Fail to ensure accumulator system is capable of providing sufficient pressure and volume | 4.6.4 (c) | $400.00 |
340. | Fail to ensure accumulator system is recharged by pressure controlled pump | 4.6.4 (d) | $400.00 |
341. | Fail to ensure accumulator capable of closing ram type preventer within 30 seconds | 4.6.4 (e) | $400.00 |
342. | Fail to ensure accumulator system is capable of closing annular preventer within 60 seconds | 4.6.4 (f) | $400.00 |
343. | Fail to ensure accumulator system is equipped with proper gauges and fittings | 4.6.4 (g) | $400.00 |
344. | Fail to ensure accumulator system is equipped with check valve | 4.6.4 (h) | $400.00 |
345. | Fail to connect accumulator system to nitrogen supply | 4.6.5 | $400.00 |
346. | Fail to ensure nitrogen supply provides sufficient volume and pressure | 4.6.6 (a) | $400.00 |
347. | Fail to ensure nitrogen supply has gauge to determine pressure | 4.6.6 (b) | $400.00 |
348. | Fail to have operating controls readily accessible and at 5 metres from well for Class I and II wells | 4.6.7 (b) | $400.00 |
349. | Fail to have an independent accumulator system with proper controls for Class III wells | 4.6.8 (a) | $400.00 |
350. | Fail to have additional set of controls for Class III wells | 4.6.8 (b) | $400.00 |
351. | Class I BOP system — fail to have diverter system with proper lines | 4.6.8.1 (a) | $400.00 |
352. | Class I BOP system — fail to have a shut-off valve in bottom joint of tubing | 4.6.8.1 (b) | $400.00 |
353. | Class I BOP system — fail to have a tubing stripper | 4.6.8.1 (c) | $400.00 |
354. | Class II &III BOP lines — fail to ensure lines are of steel or flexible hose | 4.6.8.2 (a) | $400.00 |
355. | Class II &III BOP lines — fail to have lines that are valved and of proper pressure | 4.6.8.2 (b) | $400.00 |
356. | Class II & III BOP lines — fail to have lines that are connected to rig pump and tank | 4.6.8.2 (c) | $400.00 |
357. | Class II & III BOP lines — fail to have lines that are properly fitted and connected | 4.6.8.2 (d) | $400.00 |
358. | Class II & III BOP lines — fail to have lines of proper diameter | 4.6.8.2 (e) | $400.00 |
359. | Class II & III BOP lines — fail to ensure lines are securely tied down | 4.6.8.2 (f) | $400.00 |
360. | Class II & III BOP manifold — fail to ensure valves and steel lines with proper pressure | 4.6.9 (a) | $400.00 |
361. | Class II & III BOP manifold — fail to have check valve | 4.6.9 (b) | $400.00 |
362. | Class II & III BOP manifold — fail to have pressure relief valve | 4.6.9 (c) | $400.00 |
363. | Class II & III BOP manifold — fail to install or have available accurate gauge | 4.6.9 (d) | $400.00 |
364. | Fail to provide accurate pressure gauge during well shut-in | 4.6.10 | $400.00 |
365. | Fail to maintain on a service rig a safety valve in the open position | 4.6.11 | $400.00 |
366. | Fail to conduct a pressure test on each preventer prior to commencing operations | 4.6.12 | $400.00 |
367. | Fail to conduct pressure test on preventers with pipe in the hole | 4.6.13 | $500.00 |
368. | Fail to ensure BOP equipment is mechanically tested daily | 4.6.14 | $500.00 |
369. | Fail to record tests in log book | 4.6.15 | $400.00 |
370. | Fail to ensure properly certified driller at site | 4.6.17 (a) | $700.00 |
371. | Fail to ensure rig crew is trained in operation of BOP equipment | 4.6.17 (b) | $700.00 |
372. | Fail to ensure that BOP drills are performed every 7 days | 4.6.17 (c) | $500.00 |
373. | Fail to ensure BOP drills are recorded in log book | 4.6.17 (d) | $400.00 |
374. | Fail to provide sufficient heat in cold weather to ensure BOP system effective | 4.6.18 | $400.00 |
375. | Fail to properly space equipment at well site | 4.7 | $400.00 |
376. | Fail to maintain orderly work site | 5.1 (a) | $750.00 |
377. | Fail to safely store all chemicals and fuel | 5.1 (b) | $750.00 |
378. | Fail to properly remove and dispose of waste and unused equipment | 5.1 (c) | $750.00 |
379. | Fail to properly dispose of oil field fluid produced from a well | 5.1.1 (a) | $750.00 |
380. | Fail to properly handle, store or dispose of any products or waste | 5.1.1 (b) | $750.00 |
381. | Fail to immediately remove product or waste that create a hazard | 5.1.1 (c) | $750.00 |
382. | Fail to dispose of and keep stimulation fluids separate from oil field fluids | 5.1.1 (d) | $550.00 |
383. | Fail to identify well with prominent sign | 5.2 | $450.00 |
384. | Fail to mark battery or production site with name of operator | 5.3 (a) | $450.00 |
385. | Fail to show operator’s name and emergency phone number at site | 5.3 (b) | $450.00 |
386. | Fail to prevent waste of oil or gas | 5.4 (a) | $750.00 |
387. | Fail to flare gas | 5.4 (b) | $450.00 |
388. | Fail to meet setback requirements | 5.5 | $500.00 |
389. | Locate flares less than 75 metres from buildings | 5.5.1 (a) | $500.00 |
390. | Locate flares less than 50 metres from pipeline, electrical lines,railway or aircraft runway | 5.5.1 (b) | $500.00 |
391. | Locate flares less than 30 metres from wellhead, tanks and buildings | 5.5.1 (c) | $500.00 |
392. | Locate flares less than 15 metres from compressors, coolers, vessels and substations | 5.5.1 (d) | $500.00 |
393. | Locate oil and brine tanks less than 75 metres from buildings | 5.5.2 (a) | $500.00 |
394. | Locate oil and brine tanks less than 30 metres from pipelines, electrical lines, pits, office or switch gear | 5.5.2 (b) | $500.00 |
395. | Locate oil and brine tanks less than 20 metres from wellhead, railway or road allowance | 5.5.2 (c) | $500.00 |
396. | Locate oil and brine tanks less than 15 metres from compressors, buildings, coolers, heaters or vessels | 5.5.2 (d) | $500.00 |
397. | Locate oil and brine tanks less than 1 metre from other oil and brine tanks | 5.5.2 (e) | $500.00 |
398. | Locate process vessel less than 60 metres from buildings | 5.5.3 (a) | $500.00 |
399. | Locate process vessel less than 20 metres from railway or road allowance | 5.5.3 (b) | $500.00 |
400. | Locate process vessel less than 15 metres from tanks, pits, wellhead or office | 5.5.3 (c) | $500.00 |
401. | Locate process vessel less than 10 metres from other vessels | 5.5.3 (d) | $500.00 |
402. | Locate process vessel 7 metres from tanks where vessel is unfired | 5.5.3 (e) | $500.00 |
403. | Fail to properly equip diesel engines | 5.5.4 | $500.00 |
404. | Fail to ensure internal combustion engine is 15 metres from well when obtaining air | 5.5.4.1 | $500.00 |
405. | Engine exhaust pipe — fail to prevent emergence of flame | 5.5.4.2 (a) | $500.00 |
406. | Engine exhaust pipe — fail to ensure pipe end is 2 metres from well | 5.5.4.2 (b) | $500.00 |
406.1 | Fail to store oil or oil field fluids in proper container | 5.6 (a) | $700.00 |
406.2 | Store oil and oil field fluids in earthen pit, pond or underground tank | 5.6 (b) | N.S.F. |
407. | Fluid storage tanks — fail to surround with dike or firewall of proper capacity | 5.6.1 (a) | $700.00 |
408. | Fluid storage tanks — insufficient permeability | 5.6.1 (b) | $700.00 |
409. | Fluid storage tanks — fail to maintain dike or firewall in good condition | 5.6.1 (c) | $500.00 |
410. | Fail to use proper above ground storage tank to store oil and brine | 5.6.2 | $700.00 |
411. | Fail to electrically ground above ground tank | 5.6.4 (a) | $500.00 |
412. | Fail to electrically ground trucks when loading/unloading | 5.6.4 (b) | $500.00 |
413. | Fail to comply with API RP651 for cathodically protected above ground tanks | 5.6.5 | $500.00 |
414. | Storage tank nameplate — fail to state construction standard | 5.6.6 (a) | $350.00 |
415. | Storage tank nameplate — fail to state the year built | 5.6.6 (b) | $350.00 |
416. | Storage tank nameplate — fail to state capacity | 5.6.6 (c) | $350.00 |
417. | Storage tank nameplate — fail to state fabricator | 5.6.6 (d) | $350.00 |
418. | Storage tank nameplate — fail to state diameter and height | 5.6.6 (e) | $350.00 |
419. | Piping systems — fail to use proper pipeline | 5.7 | $700.00 |
420. | Piping systems — fail to use proper material for pipeline fabrication and installation | 5.7.1 | $700.00 |
421. | Piping systems — fail to provide a certified Examiner for pipeline construction | 5.7.2 | $700.00 |
422. | Piping systems — fail to have proper pipeline burial depth | 5.7.3 | $700.00 |
423. | Pressure vessel — fail to properly install, repair, construct or inspect | 5.8 | $750.00 |
424. | Well flare stacks — fail to have proper height and diameter | 5.9 (a) | $450.00 |
425. | Well flare stacks — fail to have proper height and diameter | 5.9 (b) | $450.00 |
426. | Well flare stacks — fail to properly install, operate and design | 5.9 (c) | $450.00 |
427. | Gas compressors — fail to properly design, construct, operate and maintain | 5.10.1 (a) | $750.00 |
428. | Gas compressors — fail to ensure shutdown controls operate properly | 5.10.1 (b) | $450.00 |
429. | Gas compressors — fail to ensure shut down controls are triggered on high and low pressure | 5.10.1 (c) | $450.00 |
430. | Fail to ensure electrical materials conform to Electrical Code | 5.11 (a) | $350.00 |
431. | Fail to ensure electrical materials conform to CSA | 5.11 (b) | $350.00 |
432. | Fail to ensure electrical materials conform to API Standards | 5.11 (c) | $350.00 |
433. | Fail to ensure electrical materials conform to the Shipping Act (Canada) | 5.11 (d) | $350.00 |
434. | Fail to ensure electrical equipment is installed by qualified electrician | 5.11.1 | $350.00 |
435. | Fail to ensure pressure control, limiting and relieving equipment conform to CSA code | 5.12 | $350.00 |
436. | Fail to ensure that fires are safeguarded to avoid a hazard | 5.13 (a) | $500.00 |
437. | Fail to store explosives 150 metres from work | 5.13 (b) | $500.00 |
438. | Fail to provide for an Examiner to check works weekly for leaks or spills | 5.14 (a) | $450.00 |
439. | Fail to provide for an Examiner to check works weekly for damage | 5.14 (b) | $450.00 |
440. | Fail to provide for an Examiner to check works weekly for unsafe conditions | 5.14 (c) | $450.00 |
441. | Fail to provide for an Examiner to certify annually that works comply with Provincial Standards | 5.14.1 | $450.00 |
442. | Suspended wells — fail to isolate all zones from one another | 5.15 (a) | $600.00 |
443. | Suspended wells — fail to ensure all fresh water zones are isolated by cemented casing | 5.15 (b) | $600.00 |
444. | Porous and permeable fluid bearing zones — fail to isolate zones with bridge plug and cement | 5.15.1 (a) | $550.00 |
445. | Porous and permeable fluid bearing zones — fail to isolate zone with a bridge capped with stone and cement | 5.15.1 (b) | $550.00 |
446. | Porous and permeable fluid bearing zones — fail to isolate zones by alternative technique | 5.15.1 (c) | $550.00 |
447. | Porous and permeable fluid bearing zone — fail to ensure cementing procedures and design complies with Provincial Standards | 5.15.1 (d) | $550.00 |
448. | Suspended well onshore — fail to have two bull-plugged valves | 5.15.2 (a) | $400.00 |
449. | Suspended well onshore — fail to install two valve and bull-plugged side outlets | 5.15.2 (b) | $400.00 |
450. | Suspended well onshore — fail to isolate the intermediate casing annulus before suspending well | 5.15.2 (c) | $400.00 |
451. | Suspended well onshore — fail to provide access to a two-valved bull plug at annulus | 5.15.2 (d) | $400.00 |
452. | Suspended well onshore — fail to protect wellhead with steel posts or fencing | 5.15.2 (e) | $400.00 |
453. | Suspended well onshore — fail to remove valve handles or install lock and chain | 5.15.3 (a) | $400.00 |
454. | Suspended well onshore — fail to enclose well site with building or chain-link fence | 5.15.3 (b) | $400.00 |
455. | Suspended well onshore — fail to inspect wellhead and valves for leaks | 5.15.4 | $400.00 |
456. | Suspended well onshore — fail to lubricate and service wellhead valves annually | 5.15.5 | $400.00 |
457. | Suspended well onshore — fail to provide for an Examiner to certify well suspended properly | 5.15.6 (a) | $550.00 |
458. | Suspended well onshore — fail to annually examine all valve outlets for safety and integrity | 5.15.6 (b) | $550.00 |
459. | Site rehabilitation — fail to rehabilitate within one year of end of operations | 5.16 | $700.00 |
460. | Site rehabilitation — fail to dispose of all liquid and solid waste | 5.16 (a) | $700.00 |
461. | Site rehabilitation — fail to clean area of all debris | 5.16 (b) | $700.00 |
462. | Site rehabilitation — fail to drain and fill excavations | 5.16 (c) | $700.00 |
463. | Site rehabilitation — fail to remove surface works, concrete, machinery and materials | 5.16 (d) | $700.00 |
464. | Site rehabilitation — fail to level and restore grade | 5.16 (e) | $700.00 |
465. | Site rehabilitation — fail to provide Examiner to certify rehabilitation complies with Provincial Standards | 5.16 (f) | $750.00 |
466. | Water covered area — fail to ensure wellhead is properly located and encased | 5.17 (a) | $750.00 |
467. | Water covered area — fail to ensure wellhead is properly located in fishing area | 5.17.1 | $750.00 |
468. | Water covered area — fail to remove structure within 30 days of end of drilling or plugging | 5.17.2 | $750.00 |
469. | Water covered area — Use a platform not approved by the Ministry | 5.17.3 | N.S.F. |
470. | Well in water covered area — fail to mark each well and pipeline junction | 5.17.4 (a) | $550.00 |
471. | Well in water covered area — fail to identify operator and junction designation | 5.17.4 (b) | $550.00 |
472. | Well in water covered area — fail to maintain markers | 5.17.4 (c) | $350.00 |
472.1 | Offshore pipeline gathering system not designed, constructed or maintained in accordance with CSA Z662-99 | 5.17.5 | N.S.F. |
473. | Fail to install metering equipment to measure tubing and casing pressure | 6.1 (a) | $450.00 |
474. | Fail to install metering equipment to measure flow rate | 6.1 (b) | $450.00 |
475. | Fail to install metering equipment to permit oil, gas or water sampling | 6.1 (c) | $450.00 |
476. | Fail to keep records of quantities of oil, gas and water produced | 6.2 (a) | $400.00 |
477. | Fail to keep records of average separator pressure | 6.2 (b) | $400.00 |
478. | Fail to keep records of product disposition | 6.2 (c) | $400.00 |
479. | Fail to keep records of purchaser and amount realized | 6.2 (d) | $400.00 |
480. | Fail to prevent waste of hydrocarbon resources | 6.3 (a) | $700.00 |
481. | Fail to prevent the waste of reservoir energy | 6.3 (b) | $700.00 |
482. | Fail to maximize ultimate recovery of oil and gas | 6.3 (c) | $700.00 |
483. | Fail to minimize flaring or venting of gas | 6.3 (d) | $700.00 |
484. | Fail to obtain information to optimize production and evaluate conservation | 6.4 | $400.00 |
485. | Fail to maintain monthly records of production volumes, reservoir pressure and fluids injected | 6.4.1 | $400.00 |
486. | Fail to properly meter for fluid and gas measurements | 6.5 | $500.00 |
487. | Fail to ensure meter accuracy for fluid and gas measurements | 6.6 (a) | $500.00 |
488. | Fail to ensure meter re-calibration | 6.6 (b) | $500.00 |
489. | Fail to report bottom hole pressure to Ministry on Form 7 | 6.7 | $400.00 |
490. | Fail to properly determine bottom-hole pressure | 6.8 | $400.00 |
491. | Fail to take a gas or oil sample for each new oil pool | 6.9 | $400.00 |
492. | Initial production testing period report — fail to include daily production volumes on report | 6.10 (a) | $400.00 |
493. | Initial production testing period report — fail to include estimate of well’s potential | 6.10 (b) | $400.00 |
494. | Initial production testing period report — fail to include plans for gas conservation | 6.10 (c) | $400.00 |
495. | Initial production testing period report — fail to include evaluation, estimate and pool boundary | 6.10 (d) | $400.00 |
496. | Initial production testing period report — fail to include bottom hole pressure | 6.10 (e) | $400.00 |
497. | Fail to flare gas | 6.11 | $550.00 |
498. | Permit flaring in excess of permitted monthly volumes | 6.11.1 | $550.00 |
498.1 | Fail to produce well evenly throughout the month | 6.11.3 | $550.00 |
499. | Fail to contain flaring within permitted monthly volumes — same pool, 2 or more wells | 6.11.4 | $550.00 |
500. | Fail to take an annual shut-in pressure measurement | 6.12 (a) | $400.00 |
500.1 | Fail to report measurements | 6.12 (b) | $400.00 |
501. | Fail to report observed field data re deliverability of well to Ministry on Form 7 | 6.12 (c) | $400.00 |
502. | Fail to take annual shut-in pressure with dead-weight gauge | 6.12.1 (a) | $400.00 |
503. | Fail to take annual shut-in pressure within proper time | 6.12.1 (b) | $400.00 |
504. | Fail to report annual shut-in pressure on Form 8 | 6.12.1 (c) | $400.00 |
505. | Design — fail to permanently protect water formations from contamination | 7 (a) | $750.00 |
506. | Design — fail to protect existing formations from injected fluid | 7 (b) | $750.00 |
507. | Design — fail to prevent migration of fluids between formations | 7 (c) | $750.00 |
508. | Operation — fail to ensure that disposal fluids are compatible with disposal formation | 7 (d) | $750.00 |
509. | Operation — fail to ensure that disposal fluids are retained within formation | 7 (e) | $750.00 |
510. | Construction — fail to notify in writing landowners and operators within 750 metres | 7.1 (a) | $450.00 |
511. | Construction — fail to notify in writing the local municipality | 7.1 (b) | $450.00 |
512. | Construction — fail to notify Ministry in writing | 7.1 (c) | $450.00 |
513. | Design — fail to provide for injection of oil field fluid through tubing | 7.2 (a) | $450.00 |
514. | Design — fail to provide isolation of annular space between tubing and casing from injection zone | 7.2 (b) | $450.00 |
515. | Design — fail to include corrosion inhibitor | 7.2 (c) | $450.00 |
516. | Design — fail to provide for isolation of fresh water zones | 7.2 (d) | $450.00 |
517. | Design — fail to provide for cementing the surface casing | 7.2 (e) | $450.00 |
518. | Design — fail to provide for proper wellhead components | 7.2 (f) | $450.00 |
519. | Water sampling — fail to collect samples for each penetrated aquifer and record depth | 7.3 (a) | $400.00 |
520. | Water sampling — fail to provide a copy of the chemical analysis of water in penetrated aquifer to the Ministry | 7.3 (b) | $400.00 |
521. | Convert existing well 20 years or older to a disposal well | 7.4.1 | $750.00 |
522. | Fail to submit completed disposal report | 7.5 | $200.00 |
523. | Disposal operations — inject oil field fluid from another source | 7.6 (a) | $200.00 |
524. | Disposal operations — inject liquid industrial waste | 7.6 (b) | $200.00 |
525. | Disposal operations — inject oil field fluid between outermost casing and well bore or annular space between strings of casing | 7.6 (c) | $200.00 |
545. | Fail to inject oil field fluids by gravity feed | 7.7 (a) | $550.00 |
546. | Fail to inject oil field fluids into formations as deep as practical | 7.7 (b) | $550.00 |
547. | Pre-commissioning — fail to identify wells within 750 metres | 7.8 (a) | $500.00 |
548. | Pre-commissioning — fail to confirm integrity of injection casing by pressure tests or cement logs | 7.8 (b) | $500.00 |
548.1 | Pre-commissioning — fail to run a cement bond log to verify cement integrity | 7.8 (c) | $750.00 |
549. | Pre-commissioning — fail to conduct injectivity test | 7.8 (d) | $400.00 |
550. | Pre-commissioning — fail to submit a disposal report | 7.8 (e) | $400.00 |
551. | Pre-commissioning — fail to submit an operating procedure | 7.8 (f) | $400.00 |
552. | Well within 750 metres of water well — fail to report depth of water well | 7.8.1 (a) | $400.00 |
553. | Well within 750 metres of water well — fail to report the age of water well | 7.8.1 (b) | $400.00 |
554. | Well within 750 metres of water well — fail to report volume of water taken from water well | 7.8.1 (c) | $400.00 |
555. | Well within 750 metres of water well — fail to report static level of water in water well | 7.8.1 (d) | $400.00 |
556. | Injection test — fail to submit initial test | 7.9 | $400.00 |
557. | Injection test — fail to include the depths of the injection intervals | 7.9.1 (a) | $400.00 |
558. | Injection test — fail to include the rates of injection | 7.9.1 (b) | $400.00 |
559. | Injection test — fail to include the injection pressures | 7.9.1 (c) | $400.00 |
560. | Injection test — fail to include the volume and source of fluids | 7.9.1 (d) | $400.00 |
561. | Injection test — fail to ensure proper pressure during initial test | 7.9.2 | $400.00 |
562. | Injection test — initial test more than 30 days in duration | 7.9.3 (a) | $400.00 |
563. | Injection test — initial test exceeds 500 m³ of injected fluid | 7.9.3 (b) | $400.00 |
563.1 | Commence disposal operations without written approval from the Ministry | 7.10 | N.S.F. |
564. | Fail to measure the volume of injected fluid and pressure | 7.10.1 | $400.00 |
565. | Fail to verify presence of corrosion inhibiting fluid by certified Examiner | 7.10.2 | $400.00 |
566. | Fail to ensure subsurface pressure does not exceed 75 per cent of fracture pressure | 7.10.3 | $400.00 |
567. | Fail to keep plans and maps of disposal well | 7.11 | $400.00 |
568. | Fail to have a spill contingency plan | 7.12 | $400.00 |
569. | Fail to conduct a pressure test of annular space every 5 years | 7.13 | $400.00 |
570. | Fail to stop injection of fluid where loss of fluid or increase in pressure | 7.14 | $400.00 |
571. | Fail to maintain complete records for each disposal well | 7.15 | $400.00 |
583. | Fail to provide for an Examiner to examine facilities semi-annually | 7.16 | $450.00 |
584. | Well servicing — fail to install and maintain BOP | 8.1 | $700.00 |
585. | Well servicing — fail to ensure proper rating on lubricator system | 8.1.1 | $400.00 |
586. | Well servicing — fail to ensure proper spacing of equipment | 8.2 | $400.00 |
587. | Well servicing — fail to install pressure gauge to determine well annulus pressure | 8.3 | $400.00 |
588. | Well servicing — fail to maintain stabbing valve in open position | 8.5 | $400.00 |
589. | Well servicing — fail to use a stub lubricator system | 8.6 | $400.00 |
590. | Well servicing — fail to properly ground electrical system | 8.7 | $400.00 |
591. | Well servicing — fail to keep a record of all servicing on well | 8.10 | $400.00 |
591.1 | Fail to design and construct salt solution mine as required | 9.1 | N.S.F. |
592. | Fail to ensure mining operations are 150 metres from operator’s property boundary | 9.5 (b) | $700.00 |
593. | Fail to ensure salt extraction is 50 metres from operator’s property boundary | 9.5 (c) | $700.00 |
594. | Fail to ensure caverns and galleries have tight hydraulic control | 9.5.1 | $700.00 |
595. | Fail to employ a blanketing material for roof control | 9.6 | $700.00 |
596. | Drilling — fail to cement to surface all casings | 9.7 (a) | $700.00 |
597. | Drilling — fail to set production casing 3 metres into salt formation | 9.7 (b) | $700.00 |
598. | Drilling — fail to include a cement bond log and casing evaluation log | 9.7 (c) (i) | $700.00 |
599. | Drilling — fail to conduct pressure test on production casing and seat | 9.7 (c) (ii) | $700.00 |
600. | Drilling — fail to conduct pressure test of the formation below production casing seat | 9.7 (c) (iii) | $700.00 |
601. | Drilling — hanging tubing string does not comply with API standard | 9.7 (d) | $700.00 |
601.1 | Fail to carry out solution mining operations in accordance with written mining plan | 9.8 | N.S.F. |
602. | Operation and monitoring — no operating and maintenance procedures | 9.8.1 (a) (i) | $700.00 |
603. | Operation and monitoring — no emergency response procedures | 9.8.1 (a) (ii) | $700.00 |
604. | Operation and monitoring — no procedures re performance of maintenance functions | 9.8.1 (a) (iii) | $700.00 |
605. | Operation and monitoring — fail to comply with operating and maintenance procedures | 9.8.1 (b) | $700.00 |
606. | Operation and monitoring — fail to keep records necessary to administer operating and maintenance procedures | 9.8.1 (c) | $700.00 |
607. | Operation and monitoring — fail to ensure staff are trained | 9.8.1 (d) | $700.00 |
608. | Operation and monitoring — fail to update operating and maintenance procedures as required | 9.8.1 (e) | $700.00 |
609. | Operating and monitoring — fail to limit the maximum injection and withdrawal rates | 9.8.1 (f) | $700.00 |
610. | Operating and monitoring — fail to maintain documents for activities on wells and pipelines | 9.8.1 (g) (i) | $400.00 |
611. | Operating and monitoring — fail to maintain documents for downhole activities and copies of all logs | 9.8.1 (g) (ii) | $400.00 |
612. | Operating and monitoring — fail to keep daily records of water injected and brine recovered | 9.8.1 (h) (i) | $400.00 |
613. | Operating and monitoring — fail to keep daily records of volume and pressure of blanketing material | 9.8.1 (h) (ii) | $400.00 |
613.1 | Fail to conduct mechanical integrity testing as required | 9.8.2 (a) | N.S.F. |
614. | Fail to provide for an Examiner to certify the mechanical integrity of each well | 9.8.2 (b) | $750.00 |
615. | Fail to monitor hydraulic closure and provide Examiner certification annually | 9.8.3 | $750.00 |
615.1 | Fail to conduct sonar survey | 9.8.4 (a) | N.S.F. |
616. | Fail to plot the results of the sonar survey | 9.8.4 (b) | $500.00 |
616.1 | Fail to use sonar survey to ensure solution mining is in accordance with mining plan | 9.8.4 (c) | N.S.F. |
617. | Fail to conduct subsidence monitoring annually using a qualified surveyor | 9.8.5 (a) | $550.00 |
618. | Fail to properly record the subsidence data and submit to Ministry | 9.8.5 (b) | $550.00 |
619. | Fail to comply with well servicing requirements | 9.8.6 | $750.00 |
620. | Abandonment — fail to include a sonar survey on the cavern | 9.9 (a) | $750.00 |
621. | Abandonment — fail to include a mechanical test on the casing | 9.9 (b) | $750.00 |
621.1 | Fail to plug solution mining well | 9.9 (c) | N.S.F. |
621.2 | Fail to comply with CSA Standard Z341-98 Storage of Hydrocarbons in Underground Formations | 10 | N.S.F. |
622. | Hydrocarbon storage — fail to have Examiner validate mechanical integrity test | 10.1 | $750.00 |
623. | Hydrocarbon storage — fail to conduct annual examination of surface works certified by Examiner | 10.2 | $750.00 |
624. | Fail to notify the Ministry of well overhauls | 10.3 (a) (i) | $700.00 |
625. | Fail to notify the Ministry of a change of service in a cavern | 10.3 (a) (ii) | $700.00 |
626. | Fail to notify the Ministry of damage or leak at well head or casing | 10.3 (a) (iii) | $700.00 |
627. | Fail to notify the Ministry of emergency | 10.3 (b) | $700.00 |
628. | Fail to ensure protection of oil or gas producing horizons | 11 (a) | $700.00 |
629. | Fail to prevent the migration of oil, gas or water | 11 (b) | $700.00 |
630. | Fail to seal off and isolate all porous formations | 11 (c) | $700.00 |
631. | Fail to ensure plugging does not constitute a hazard to surface users | 11 (d) | $700.00 |
632. | Fail to plug hydrocarbon storage wells in accordance with CSA Z341-98 | 11.1 (a) | $700.00 |
633. | Fail to plug in accordance with section 9.9 of the Standards | 11.1 (b) | $700.00 |
634. | Fail to properly remove casing, tubing and material from well | 11.2. | $500.00 |
635. | Fail to use neat cement | 11.3 (a) (i) | $500.00 |
636. | Fail to mix cement in accordance with API Specifications | 11.3 (a) (ii) | $500.00 |
637. | Fail to make cement plug in the form of a water base slurry | 11.3 (a) (iii) | $500.00 |
638. | Fail to make cement plug sulphate resistant | 11.3 (a) (iv) | $500.00 |
639. | Fail to make bridges of wood, stone, gravel or lead | 11.3 (b) | $500.00 |
640. | Fail to deposit cement plug by displacement or dump bailer | 11.4 | $500.00 |
641. | Fail to ensure pumped cement plugs have sufficient slurry volume | 11.5 (a) | $500.00 |
642. | Fail to ensure dump-bailed plugs have sufficient volume | 11.5 (b) | $500.00 |
643. | Fail to locate plug at top of each zone or salt cavern and certify location | 11.6 (a) | $500.00 |
644. | Fail to locate the top most plug set in the well and certify location | 11.6 (b) | $500.00 |
645. | Fail to fill area between plugs with water or drilling mud | 11.7 | $500.00 |
646. | Fail to set cement plugs above and below each oil, gas and fluid bearing zone | 11.8 (a) | $500.00 |
647. | Fail to set cement plugs at top of formations | 11.8 (b) | $500.00 |
648. | Fail to extend plugs 8 metres in the well | 11.9 | $500.00 |
649. | Fail to properly recover casing when surface casing is left in hole | 11.10 (a) | $500.00 |
650. | Fail to properly recover casing when surface casing is removed | 11.10 (b) | $500.00 |
651. | Fail to place a cement plug 15 metres below zone and 15 metres above top of zone | 11.10 (c) | $700.00 |
652. | Fail to set plug across shoe of surface casing | 11.11 (a) | $700.00 |
653. | Fail to place plug inside the surface casing | 11.11 (b) | $700.00 |
654. | Fail to place plug inside casing below the base where intermediate casing cemented | 11.11 (c) | $700.00 |
655. | Fail to place plug across the shoe where intermediate casing to be left | 11.11 (d) | $700.00 |
656. | Fail to recover casing to allow placement of plugs where intermediate casing not cemented | 11.11 (e) | $700.00 |
657. | Fail to place plug inside casing below the base where production casing cemented | 11.11 (f) | $700.00 |
658. | Fail to recover casing to allow placement of plug where production casing not cemented | 11.11 (g) | $700.00 |
659. | Fail to set 8 metre plug at top of productive zone | 11.11 (h) | $700.00 |
660. | Rehabilitation — onshore well — fail to dispose of all waste | 11.13 (a) | $700.00 |
661. | Rehabilitation — onshore well — fail to clear the area of all debris | 11.13 (b) | $700.00 |
662. | Rehabilitation — onshore well — fail to drain and fill excavations | 11.13 (c) | $700.00 |
663. | Rehabilitation — onshore well — fail to remove all surface works | 11.13 (d) | $700.00 |
664. | Rehabilitation — onshore well — fail to level and restore original grade of the site | 11.13 (e) | $700.00 |
665. | Rehabilitation — water covered area — fail to cut off any casing in water covered site | 11.13.1 | $750.00 |
666. | Rehabilitation — fail to record and submit Form 10 for every plugged well | 11.14 | $400.00 |
667. | Fail to calculate using proper rates | 12 (a) | $450.00 |
668. | Fail to make fee payment | 12 (b) | $450.00 |
669. | Fail to submit Form 7 with fee payment | 12 (c) | $450.00 |
670. | Drilling activity notice — fail to notify Ministry 48 hours prior to drilling | 13.2 (a) | $400.00 |
671. | Drilling activity notice — fail to notify Ministry of drilling suspension date within 48 hours | 13.2 (b) (i) | $400.00 |
672. | Drilling activity notice — fail to notify Ministry of well depth within 48 hours | 13.2 (b) (ii) | $400.00 |
673. | Drilling activity notice — fail to notify Ministry of well condition within 48 hours | 13.2 (b) (iii) | $400.00 |
674. | Drilling activity notice — fail to notify Ministry of total depth and status of well within 48 hours of TD date | 13.2 (c) | $400.00 |
675. | Drilling activity notice — fail to notify Ministry of completion date and well status within 48 hours | 13.2 (d) | $400.00 |
676. | Drilling activity notice — fail to notify the Ministry 48 hours prior to plugging a well | 13.2 (e) | $400.00 |
676.1 | Fail to report emergency notification in writing | 13.3 | N.S.F. |
677. | Fail to complete a Drilling and Completion Report in Form 7 within 60 days of end of operation | 13.4 | $400.00 |
678. | Fail to deliver drilling samples within 30 days | 13.5 | $400.00 |
679. | Fail to properly pack and label drill cores | 13.6 (a) | $400.00 |
680. | Fail to submit core or other analysis to Ministry within 30 days of completion | 13.6.1 | $400.00 |
681. | Fail to ensure no core is destroyed | 13.7 (a) | $400.00 |
682. | Fail to ensure cores are delivered to library within 1 year of TD date | 13.7 (b) | $400.00 |
683. | Fail to supply logs or surveys to the Ministry within 30 days | 13.8 | $400.00 |
684. | Fail to complete Form 7 within 30 days of any well activities other than drilling or deepening | 13.9 | $400.00 |
685. | Fail to submit connate water determinations within 30 days | 13.10 (a) | $400.00 |
686. | Fail to submit copies of drill stem and production test within 30 days | 13.10 (b) | $400.00 |
687. | Fail to submit static hole pressure measurements within 30 days | 13.10 (c) | $400.00 |
688. | Fail to submit pressure measurements and back pressure tests within 30 days | 13.10 (d) | $400.00 |
689. | Fail to submit gas ratios within 30 days | 13.10 (e) (i) | $400.00 |
690. | Fail to submit liquid phase volumes within 30 days | 13.10 (e) (ii) | $400.00 |
691. | Fail to submit formation volume factors within 30 days | 13.10 (e) (iii) | $400.00 |
692. | Fail to submit tank oil gravities within 30 days | 13.10 (e) (iv) | $400.00 |
693. | Fail to submit separator and stock tank gas-oil ratios within 30 days | 13.10 (e) (v) | $400.00 |
694. | Fail to submit bubble point pressure of reservoir fluid within 30 days | 13.10 (e) (vi) | $400.00 |
695. | Fail to submit compressibility of saturated reservoir oil within 30 days | 13.10 (e) (vii) | $400.00 |
696. | Fail to submit viscosity of reservoir oil within 30 days | 13.10 (e) (viii) | $400.00 |
697. | Fail to submit fractional analysis of casing head gas and reservoir fluid within 30 days | 13.10 (e) (ix) | $400.00 |
698. | Fail to submit Annual Production Report of Monthly Well or Field/Pool Production by February 15 | 13.11 | $400.00 |
699. | Fail to submit an Annual Report on Monthly Injection by February 15 | 13.12 | $400.00 |
700. | Disposal well — fail to submit records of pressure measurements and tests within 30 days | 13.13 (a) (i) | $400.00 |
701. | Disposal well — fail to submit copies of chemical analysis from water wells within 30 days | 13.13 (a) (ii) | $400.00 |
702. | Disposal well — fail to submit the mechanical integrity test within 30 days | 13.13 (a) (iii) | $400.00 |
703. | Disposal well — fail to submit an Annual Subsurface Fluid Disposal Report by February 15 | 13.13 (b) | $400.00 |
704. | Disposal well — fail to submit a Plugging of a Well Report within 30 days | 13.14 | $400.00 |
705. | Disposal well — fail to submit an Annual Report of Geophysical/Agrochemical Activity by February 15 | 13.15 | $400.00 |
706. | Annual well status report — fail to show all the wells | 13.16 (a) | $400.00 |
707. | Annual well status report — fail to show the status of each well | 13.16 (b) | $400.00 |
708. | Annual well status report — fail to show calculation of well licence fee | 13.16 (c) | $400.00 |
709. | Annual well status report — not accompanied by licence fee | 13.16 (d) | $400.00 |
710. | Third party gas report — fail to submit by February 15 | 13.16 | $400.00 |
711. | Fail to submit completed third party gas report | 13.17 | $700.00 |
712. | Fail to submit completed third party oil report | 13.18 | $700.00 |
722. | Fail to submit the Initial Production Test Period Report within 10 days | 13.19 | $400.00 |
723. | Fail to report voluntarily unitized unit area and required information | 13.20 | $400.00 |
724. | Fail to report voluntarily amended unit area required information | 13.21 | $400.00 |
736. | Fail to submit an Annual Report of Solution Mined Salt Production by February 15 | 13.22 | $400.00 |
737. | Salt solution mining — fail to submit results of all tests within 30 days | 13.23 | $400.00 |
737.1 | Fail to immediately contact Ministry in case of spill or subsidence occurrence | 13.24 | N.S.F. |
738. | Underground storage tanks — fail to construct a dike surrounding the tank | 14.2 (a) | $700.00 |
739. | Underground storage tanks — fail to construct cover to prevent access | 14.2 (b) (i) | $400.00 |
740. | Underground storage tanks — fail to construct chain link fence to prevent access | 14.2 (b) (ii) | $700.00 |
741. | Underground storage tanks — fail to install a ladder inside the tank | 14.2 (c) | $700.00 |
742. | Underground storage tanks — fail to install a warning sign on the fence or cover | 14.2 (d) | $400.00 |
743. | Oil field fluid storage — fail to ensure fluid cannot create a hazard | 14.3 (a) | $700.00 |
744. | Oil field fluid storage — fail to ensure the storage area does not leak | 14.3 (b) | $700.00 |
745. | Oil field fluid storage — fail to construct a chain link fence around storage area | 14.3 (c) | $700.00 |
746. | Oil field fluid storage — fail to ensure all gates on fence are closed and locked | 14.3 (d) | $400.00 |
747. | Oil field fluid storage — fail to install prominent warning signs | 14.3 (e) | $400.00 |
748. | Oil field fluid storage — fail to install a ladder | 14.3 (f) | $700.00 |
749. | Oil field fluid storage — fail to install life-saving rescue equipment | 14.3 (g) | $700.00 |
750. | Fail to install a valve and piping on well before being serviced | 14.4 | $400.00 |
751. | Fail to cap a suspended well | 14.5 (a) | $400.00 |
752. | Fail to mark the site with well name | 14.5 (b) | $450.00 |
753. | Fail to plug the well when capable of flow to surface | 14.5 (c) | $700.00 |
Home » How do I…? » How Do I Learn about Set Fines? » Set Fines I » Schedule 70.3 – Last Updated: April 14, 2011